
Add to Cart
a. In the design of pyrolysis key device, completely overcome the local heat uneven, easy to break, low yield, short life and other unfavorable factors of the current vertical flat bottom pyrolysis plant.
b. With fast and practical feed and slag system.
c. Efficient gas heating system. In the process of refining, when the heated gas reaches 150 degrees Celsius, it will produce a lot of gas which can not be liquefied in normal temperature and pressure methane to butane.These gases are fully burned by specially designed gas nozzles, will produce a lot of energy which greatly saves energy.
d.Flue dust removal system has a desulfurization dust cather(qualified), equipped with two ways water impact cyclone dust removal chamber, which can ensure the discharge of flue outlet reach safe discharge standard.
Model:LJ-9 Raw material:Waste tire, waste plastic, waste rubber
Structure:Horizontal 24hours processing capacity:8-10tons raw materials
24hours oil output:3.2-4.5tons fuel oil Work pressure:Atmospheric
Host speed:0.4r\min Power:15.5KW
Cooling:Water cooling Lose water(T\H):8
Transport:External gear drive Heating method:Directly
Installation:Foundation Noise dB(A):≤85
Reactor size length*wideth:2200x6600 Working form:batch
Weight of Reactor(T):29 Manufacuring time:20days
Model | Raw material | Structure form | Cooling system |
LJ-9 | Waste tire, plastic,rubber | Horizontal | Water cooling |
Heating method | oil output rate | Power | Installation |
Directly | 45% | 15.5KW | Foundation |
1, To improve the quality and functions of products is our purpose, customer's satisfaction is our principle.
2, With fast and practical feed and slag system.
Efficient gas heating system.
3, stable product quality , supply, the lifetime after sale.